Facing the 15% TCL Cement Price Hike

Posted on 7th Feb 2026

TCL Premium Plus and Eco Cement Bags on Construction Site

Facing the 15% TCL Cement Price Hike: 3 Ways to Protect Your Project Costs

If you price jobs in bags, blocks, or yards, this one hits fast. Trinidad Cement Ltd (TCL) has announced a 15% cement price increase effective February 9, 2026.

For contractors and builders, that’s not just a new number on a supplier invoice. It can squeeze margins, force last-minute quote edits, and put cash flow under pressure right when you’re trying to keep crews moving. Even a small job can swing from “safe” to “tight” with one update.

The good news is you still have options that don’t involve lowering quality. Below are three practical ways to protect project costs, plus a quick pre-pour check you can run in minutes. AMCOL keeps close watch on changes like this, so you can plan with real info, not rumors.

What the 15% TCL cement price hike means for your next pour

A 15% increase usually lands in three places: your material line item, your bid risk, and your change-order conversations. If you quoted a fixed price last month and the cement lands after February 9, 2026, you may be stuck eating the difference.

TCL has linked this increase to rising natural gas costs, a major input cost tied to cement manufacturing and related operations. When energy costs rise, cement pricing often follows because production and handling depend on steady, high-energy processes.

The Math: If cement for a small slab or repair takes 200 bags, a 15% increase means you now pay for the equivalent of 30 extra bags (in cost) compared to the old rate.

Why can natural gas costs push cement prices up?

Cement production needs consistent heat and power. Natural gas is commonly tied to the energy that keeps plant operations running, including high-temperature processes and day-to-day facility demand. Energy also connects to "in-between" costs like handling, packaging, and logistics.

The hidden budget hits: freight, waste, and rework

The bag price is only part of what you pay. Waste often comes from over-ordering “just in case,” spillage, bags pulling moisture, and mixes that miss the target. Rework is the quiet budget killer: extra labor, extra cement, and extra time.

3 ways to protect your project costs without lowering quality

1. Bulk-buy before February 9 and lock in supply

If you have pours scheduled soon, buying ahead can protect your pricing. Ensure you have dry storage, pallets off the floor, and proper covers. AMCOL can help you sanity-check quantities and stage deliveries so you’re not stacking more than you can use in time.

2. Maximize yield with the right additives (including Micro Milling)

One option to discuss is Micro Milling, which can help the mix perform more efficiently through better particle packing. It helps the mix come together more smoothly and reduces avoidable waste during finishing.

  • Do: Test a small batch first.
  • Do: Follow supplier guidance.
  • Do Not: Guess dosages or “eyeball” it on site.

3. Cut waste that makes price hikes feel worse

Measure forms accurately to avoid "safety" over-ordering. Control water levels to prevent weakening the concrete, and keep aggregates consistent. Protect bags from moisture and plan crew timing to ensure concrete is placed on time.

Use this simple cost check:

  • Confirm the effective date: February 9, 2026.
  • Update estimate rates for any deliveries after this date.
  • Review contract language regarding material price adjustments.
  • Pick your strategy: Buy ahead, improve yield, or tighten waste control.

Conclusion

The TCL 15% increase is a real cost swing. You can’t control the market, but you can control your timing and efficiency. Buy ahead when quantities are clear, improve yield with smart mix choices, and cut the waste that turns profit into rework.